Deposit
Description
3 Hours Daily Weekly Monthly








BREAKERS & DEMOLITION HAMMERS














60.00
7 lb. Demolition Hammer
16.00 25.00 100.00 300.00
80.00
12 lb. Demolition Hammer
18.00 30.00 120.00 360.00
100.00
20 lb. Demolition Hammer
20.00 32.00 140.00 420.00
100.00
42 lb. Demolition Hammer
25.00 40.00 160.00 480.00
200.00
60 lb. Demolition Hammer
30.00 50.00 200.00 600.00
60.00
Buster Bar - Manual Breaker
-- 12.00 48.00 125.00
100.00
Air Scaler/Chisel 90 psi @ 4.5 CFM
-- 35.00 140.00 400.00
180.00
Heavy Duty Air Scaler 100 psi @ 18 CFM
-- 50.00 200.00 600.00


Point or Narrow Chisel

6.00/use



Wide Chisel 3”

7.00/use



Bushing Head/ Post Driver

15.00/day



Spade/Compaction Plate/Ground Rod Driver

8.00/day



Air Scaler Blade Holder/4” Chisel

6.00/day



Air Scaler 4” Blade

5.00/use



Air Scaler 8” Blade/Roofing Blade

6.00/use









HAMMER DRILLS & ROTOHAMMERS














80.00
Medium Roto Hammer (S.D.S. plus, up to ¾”)
15.00 25.00 100.00 300.00
100.00
Large Roto Hammer (S.D.S. Max)
30.00 40.00 160.00 480.00


Up to 12” long - $1.50 per ¼” 13”-18” - $2.50 per ¼” 19”-36” - $4.00 per ¼”




200.00
Concrete Coring Drill w/Vacuum Pump
50.00 75.00 300.00 900.00
100.00
CORE BIT USE CHARGE: $10.00 per inch in diameter + $3.00/1000” wear charge












CONCRETE EQUIPMENT














200.00
2 - 2 ½ Bag Mortar Mixer (8 HP gas)
-- 60.00 240.00 650.00
150.00
Portable Concrete Mixer (5 cubic feet)
-- 35.00 140.00 420.00
200.00
48” Power Trowel (5 HP gas)
-- 40.00 160.00 480.00
150.00
36” Power Trowel (5 HP gas)
-- 35.00 140.00 420.00
60.00
8 ft. Concrete Vibrator (electric)
18.00 25.00 100.00 300.00
30.00
Bull Float
-- 5.00 20.00 60.00
60.00
Rolling Tamper 36”
-- 12.00 48.00 144.00
30.00
Tamper
-- 5.00 20.00 60.00
20.00
42” or Fresno Finishing Trowel
-- 6.00 24.00 72.00
10.00
Pole Walking Edger
-- 4.00 16.00 48.00
10.00
Extensions (each)
-- 1.00 4.00 12.00
10.00
Jointer, Seamer
-- 4.00 16.00 48.00
20.00
Concrete Broom
-- 4.00 16.00 48.00
10.00
Hand Trowels
-- 2.00 4.00 12.00
10.00
Boots
-- 2.00 8.00 24.00
75.00
Concrete Kit
-- 25.00 100.00 300.00


(includes: bull float, tamper, edger, 2 extensions, 36” finish, and jointer)




40.00
Wheelbarrows
-- 9.00 36.00 108.00











2